Published on November 25, 2026
Effect of Public Financial Management Regulations for the Budget Process on Service Delivery in Malawian Local District Councils
Authors
Abstract
Despite the Malawian Government’s efforts to strengthen Public Financial Management (PFM) regulations for the budget process, service delivery in Malawian local district councils remains below the minimum performance threshold of 50%. The study therefore aimed to determine the effect of PFM regulations for the budget process on service delivery in the Councils of M’mbelwa, Nkhata Bay, and Rumphi. Using a case study design with an exploratory sequential mixed-methods approach, data were collected from 388 purposively sampled respondents through questionnaires, focus group discussions, observation, key informant interviews, document analysis, and field visits. The findings revealed a high level of non-compliance with PFM regulations for the budget process, which led to unsatisfactory budget formulation, community project implementation, budget execution, and accounting and reporting. The study concludes that the local district councils’ service delivery model for the budget process should be restructured in line with the Direct Service Facility Financing model.
Keywords: Public financial management regulations, budget process, budget formulation, budget approval, budget execution, service delivery
Introduction
Despite efforts by the Malawian Government and donor partners to strengthen public financial management regulations to enhance service delivery in Malawian local district councils (Rodríguez et al., 2023), both the District Councils’ Performance Assessment report (2018/2019) and the Auditor General’s report of 2024 indicated that the national service delivery performance of Malawian local district councils was 39% (and 36% in 2023/2024), below the average score of 50%. This means councils underperformed despite substantial support to strengthen public financial management regulations, such as those governing the budget process. This was also shown in the 2018/19 Local Authority Performance Assessment (LAPA) report, which found that the majority of councils, 19 (68%), were underperforming on service delivery, while three District Councils (11%), namely, Chikwawa, Karonga, and Rumphi, had unacceptable performance on service delivery, while Blantyre, Nkhata Bay, Mangochi, Chiradzulu and Phalombe made significant improvements, as shown by their higher scores in the 2018/19 fiscal year. However, LAPA 2022/2023 reported that M’mbelwa and Rumphi District Councils were among the lowest performers in financial management and resulting service delivery, with scores of 30% and 0%, respectively. The underperformance of most councils has significant implications for service delivery and for the quality of life of the people they serve. For instance, a World Bank (2024) report concurs with the LAPA and audit reports that Malawians suffer from poverty partly because they cannot access adequate, good-quality services, such as education, water, energy, health, agriculture, and infrastructure development in their respective districts despite considerable support from the Malawi Government to enhance service delivery. Welham et al. (2013) similarly report that the budget process affects whether service delivery performance scores fall above or below the average. If the budget process is executed in accordance with financial management regulations, performance scores tend to be above average; if the budget process is obstructed, service delivery scores are likely to fall below average. This underscores the importance of effective financial management and accountability in public service delivery, as emphasised by Stewardship Theory, Financial/Fiscal Accountability Theory, and New Public Management Theory, which collectively highlight the need for transparent, efficient, and accountable budget processes to achieve better service delivery outcomes.
Stewardship Theory on Service Delivery
The public financial budget cycle has been examined through Stewardship Theory, which has its roots in psychology and sociology. Davis, Schoorman and Donaldson (1997, p. 28) point out that “a steward protects and maximizes shareholders’ wealth through firm performance, because by so doing, the steward’s utility functions are maximized”. In this view, stewards are company executives and managers who work for shareholders; they protect and increase shareholders' profits. This theory resonates with the current study because it discourages individualism and instead encourages the role of Local District Council Service Committees, top management officials, public service beneficiaries and, specifically, the Local District Treasury officials and local community beneficiaries, as stewards, integrating their goals as part of the whole local district council budget execution. In the stewardship perspective, Local District Council treasury officials (stewards) are satisfied and motivated when governments perform well. In addition, Davis, Schoorman and Donaldson (1997) also point out that the Stewardship Theory recognises the importance of structures that empower the steward and offer maximum autonomy to executives and directors who are also managing their careers in order to be seen as effective stewards of their organisation. Chukwuma, Alaefule and Jideofor (2021) argue that managers return finance to investors to establish an excellent reputation, thereby allowing them to re-enter the market for future financing.
This study uses Stewardship Theory to examine how the Local District Council Service Committees, officials, and public service beneficiaries, as stewards, take ownership of their roles and work diligently to achieve optimal service delivery across Malawian local district councils. The theory also suggests unifying the roles of the District Commissioner and the Local District Council Service Committees to reduce agency costs and strengthen their roles as stewards in providing and managing services in local district communities. In this way, there would be better safeguarding of the interests of the country’s citizens (Lepore et al., 2017).
Financial/Fiscal Accountability Theory on Service Delivery
According to Orie (2023), the Financial/Fiscal Accountability Theory posits that political and administrative functionaries must ensure that the funds committed to a government programme yield appreciable dividends of democracy in terms of desired goals, which should outweigh or justify the input (enormity of funds). The action should not only be demonstrated to the public, but must be transparently proven. The theory further explains how and for what purposes the public funds are disbursed to prevent embezzlement. Financial accountability requires efficiency (input-to-output ratio) and effectiveness (achieved output compared with declared goals and objectives) in any public sector (Orie, 2023). In this regard, an independent auditing system provided by the Auditor General (in local governments) is engaged. In Malawi, the Constitution of the Republic of Malawi and the Public Audit Act of 2003 (Cap. 37:01) provide for this.
New Public Management (NPM) Theory on Service Delivery
The New Public Management (NPM) Theory emerged in the early 1980s, inspired by public choice theory and managerialism (Endeki and Minja, 2021). Early adopters of NPM included Margaret Thatcher’s government in the United Kingdom, municipal governments in the United States, and later, local governments in New Zealand. Proponents of NPM wanted a framework to reform public sector service delivery and move it away from the traditional, highly bureaucratic model (Endeki and Minja, 2021). The most significant assumption of NPM theory is that government and public sector agencies can become more efficient and effective if the private sector's performance incentives and discipline are introduced into the public sector. In this regard, the theory introduces aspects of economic market models in political and public sector administration.
The New Public Management Theory has five central axioms (Endeki and Minja, 2021). Firstly, the theory emphasises the importance of increased efficiency so that public sector agencies improve the input-output ratio to address the substantial levels of expenditure in the public sector as a way of removing inefficiencies in processes. The second aspect is the decentralisation of resources and functions to create efficiency, flexibility, and responsiveness of public sector organisations to address the needs of their customers. The third maxim of the theory involves increasing accountability by making public sector service providers more accountable. The fourth assumption is improved resource management. In this case, public sector organisations need to refocus the way they use financial, human, and other resources by ensuring that there is proper planning, management, and measurement of results. The last component involves public sector organisations marketing their services. Integrating market forces in the delivery of public sector services can improve the relationship that the organisations share with the citizens, drive costs down, and improve efficiency levels.
It is essential to point out that the goal of the NPM model is to reform public sector organisations, particularly by removing rigid hierarchical structures and replacing them with dynamic systems. The removal of rigid structures is done by increasing the levels of accountability and autonomy among public managers, together with entrenching an entrepreneurial culture when it comes to the utilisation of public resources to increase productivity. The other element of reforming public sector organisations embodies a deliberate effort to replace the authoritarian and top-down way of making decisions with a model that promotes a bottom-up and consensual approach.
The essence of this reform is to ensure sufficient participation of consumers of public sector services and to bring together all stakeholders. Also, a bottom-up and consensual approach promotes decentralisation of control and provides a wide range of opportunities for citizens to get services. More importantly, this works if public organisations adopt quasi-marketisation of services. In this regard, the application of market principles increases the productivity and efficiency of public organisations. Besides, it promotes a results-driven culture and targets transparency, which is a rarity in most public sector organisations (Mirandilla-Santos, 2008).
Despite the Malawian Government’s effort to enhance public financial management regulations for the budget process on service delivery in Malawian Local District Councils, service delivery performance stands at 36%, below the national benchmark of 50%, despite substantial government support for the budget process. Therefore, this study aimed to determine the effect of public financial management regulations for the budget cycle on service delivery in Malawian local district councils.
The Decentralisation Theory on Service Delivery
According to Kyohairwe et al. (2022), this decentralisation theory deals with the transfer of authority and accountability for public duties from the central government to subordinate or quasi-independent government organisations and/or the private sector. To improve service delivery in the areas of education, health, water infrastructure, buildings, farming, and reforestation, the decentralisation model presupposes that stakeholders must be included in creating budgets for government resources (Arif, 2021). District councils can effectively carry out their local agendas, including accounting, local revenue collection, budgeting, cash management, procurement, and offering high-quality services to the communities in order to reduce poverty, thanks to the decentralisation process that transfers responsibility to the local district council (Hussein, 2019). Hussein (2019) found that most local governments in Malawi have limited success with service delivery, even though this theory offers laws, rules, and standards for better service delivery in district councils.
Study Area
M’mbelwa District Council serves as the central administrative hub of Mzimba District. Therefore, this study was conducted in Mzimba, Nkhata Bay and Rumphi districts (Figure 1) between 2024 and 2025. Mzimba is the largest district in Malawi. It borders Zambia to the west, Kasungu District to the south, Nkhata Bay District to the east, Nkhotakota District to the southeast, and Rumphi District to the north, and it has a total land area of 10,430 square kilometres and a total population of 951,121 (National Statistical Office, 2019).
Figure 1: Study area map of Malawi showing M’mbelwa (Mzimba), Rumphi and Nkhata Bay districts
Source: Authors (2026).
Rumphi is the second largest district in the Northern Region after Mzimba District. It borders Zambia to the west and Chitipa District to the north-west, Mzimba District to the south, Nkhata Bay District to the east, and Karonga District to the north. The total land area of the district is 4,769 square kilometres with a total population of 229,163 (Rumphi District Council Socio-Economic Profile 2017/2022) (National Statistical Office, 2019).
Nkhata Bay is a lakeshore district located in the Northern Region of Malawi, covering an area of 4,182 square kilometres with a population of 284,683, bordered by Mzimba District to the west, Rumphi District to the north, Nkhotakota to the south, and Lake Malawi with Likoma, Mozambique and Tanzania across the lake to the east, and Tanzania to the northeast (National Statistical Office, 2018).
Study Design
The study adopted a case study design using an exploratory sequential mixed-methods approach, chosen for its capacity to provide an in-depth case analysis. Qualitative data were collected through open-ended questions and the analysis of the Local District Council Service Committee’s minutes and reports for 2024 and 2025, and the Local Authority Auditors’ reports from 2020 to 2023, while quantitative data were collected through closed-ended questions. The purpose was to determine the effect of public financial management regulations for the budget process on service delivery in Malawian Local District Councils of selected districts of M’mbelwa, Nkhata Bay, and Rumphi.
Population and Sampling
Purposive sampling was used to select the study sample from the target population for each District of Mzimba, Nkhata Bay, and Rumphi. This was primarily based on the knowledge, information, opinions, and experience relevant to the effects of PFM regulations on the budgeting process. Table 1 shows the study respondents, and the researcher applied Yamane’s (1967) formula, n = N/ (1 + Ne²), to calculate the sample size for each district, based on an assumption of a 95% confidence level and maximum variability (P = 0.5), where n is the sample size, N is the population size, and e is the level of precision (allowable error), 5% (0.05). Table 1 presents the sample size that was determined for each district.
For Mzimba District:
n = N/ (1 + Ne²)
When N =951,121
e = 5% or 0.05
n = 951,121 / 1 +951,121 (0.05)2
n = 951,121 /12377.8025
n = 76.84 = 76
For Nkhata Bay District:
n = N/ (1 + Ne²)
When N =284,683
e = 5% or 0.05
n = 284,683 / 1 +284,683 (0.05)2
n = 284,683 /1711.7025
n = 166.31 = 166
For Rumphi District:
n = N/ (1 + Ne²)
When N =229,163
e = 5% or 0.05
n = 229,163 / 1 +229,163 (0.05)2
n = 229,163 /1572.9075
n = 145.69 = 146
Response Rate
The response rate was 74.7% (290), which was high enough since the sample size was 388 respondents. These respondents could give their responses through a questionnaire with a scale of 1 to 5 for assessing the statements. Table 2 shows the response rate of 74.7%.
Table 1: Study sample size
Sample Unit |
M’mbelwa |
Nkhata Bay |
Rumphi |
Total |
|---|---|---|---|---|
External Auditors |
2 |
2 |
2 |
6 |
Internal Auditor |
1 |
1 |
1 |
3 |
District Commissioner |
1 |
1 |
1 |
3 |
Service Committees (Chair) |
8 |
8 |
8 |
24 |
Departmental Heads |
8 |
8 |
8 |
24 |
Area Development Committees (Chair) |
23 |
17 |
20 |
60 |
Community service beneficiaries |
33 |
129 |
106 |
268 |
Total |
76 |
166 |
146 |
388 |
Source: Field data (2024).
Table 2: Sample size response rate
Sample Unit |
M’mbelwa |
Nkhata Bay |
Rumphi |
Total |
|---|---|---|---|---|
External Auditors |
2 |
2 |
2 |
6 |
Internal Auditors |
1 |
1 |
1 |
3 |
District Commissioners |
1 |
1 |
1 |
3 |
Service Committees Chairs |
5 |
6 |
7 |
18 |
Departmental Heads |
6 |
7 |
5 |
18 |
Area Development Committee Chairs |
16 |
10 |
18 |
44 |
Community service Beneficiaries |
24 |
96 |
78 |
198 |
Total |
55 |
123 |
112 |
290 |
Source: Field data (2024).
Data Collection
Sukmawati (2023) defines data collection as a means by which information is obtained from the selected subjects of an investigation. Asenahabi (2019) observes that the choice of a tool and instrument depends mainly on the attributes of the subject, research topic, data, and expected results. In social sciences, the most used instruments are questionnaires, interview schedules, observational forms, focus group discussions, documentation review and standardised tests (Rahi et al., 2019). In this study, the researchers recruited and trained three research assistants who understood the study's purpose and had the knowledge and skills to collect data using the following instruments: focus group discussions, key informant interviews, questionnaires, observation, and field visits. These instruments were pre-tested in a pilot study, and revisions were made to ensure that respondents understood them. Tables 3 and 4 below show the number of Key Informant Interview (KII) participants, and Tables 5 and 6 show the Focus Group Discussion (FGD) participants for each selected district. Table 7 shows respondents' demographic characteristics.
Table 3: Key informant interview (KII) participants
Sample Unit |
M’mbelwa |
Nkhata Bay |
Rumphi |
Total |
|---|---|---|---|---|
Senior Chief |
1 |
1 |
1 |
3 |
District Commissioner |
1 |
1 |
1 |
3 |
Principal Auditors |
1 |
1 |
1 |
3 |
Internal Auditors |
1 |
1 |
1 |
3 |
Full council chairpersons |
1 |
1 |
1 |
3 |
Number of participants |
5 |
5 |
5 |
15 |
Source: Field data (2024).
Table 4: Key informant interview (KII) response rate
Sample Unit |
M’mbelwa |
Nkhata Bay |
Rumphi |
Total R. Rate |
|---|---|---|---|---|
Senior Chief |
1 |
1 |
1 |
3 3 |
District Commissioner |
1 |
1 |
1 |
3 3 |
Principal Auditors |
1 |
1 |
1 |
3 3 |
Internal Auditors |
1 |
1 |
1 |
3 3 |
Full council chairpersons |
1 |
1 |
1 |
3 3 |
Number of participants |
5 |
5 |
5 |
15 15 |
Source: Field data (2024).
Table 5: Focus group discussion participants
Sample Unit |
M’mbelwa |
Nkhata Bay |
Rumphi |
Total |
|---|---|---|---|---|
Number of ADC’s |
23 |
17 |
20 |
60 |
FGDs |
2 |
7 |
5 |
14 |
Number of participants |
33 |
129 |
106 |
268 |
Source: Field data (2024).
Table 6: Focus group discussion response rate
Sample Unit |
M’mbelwa |
Nkhata Bay |
Rumphi |
Total |
|---|---|---|---|---|
Number of ADC’s |
18 |
14 |
16 |
48 |
FGDs |
2 |
7 |
5 |
14 |
Number of participants |
27 |
99 |
86 |
212 |
Source: Field data (2024).
Table 7: Demographic characteristics of respondents
Variable |
Category |
F |
% |
|---|---|---|---|
Gender |
Male |
201 |
69.2 |
|
Female |
89 |
30.8 |
|
Total |
290 |
100.0 |
Academic Qualification |
Master’s Degree |
37 |
12.8 |
|
Bachelor’s Degree |
119 |
41.0 |
|
Diploma |
75 |
26.0 |
|
Certificate |
47 |
16.2 |
|
None |
12 |
4.0 |
|
Total |
290 |
100.0 |
Working Status |
Employed (Yes) |
195 |
67.2 |
|
Not Employed (No) |
95 |
32.8 |
|
Total |
290 |
100.0 |
Source: Field data (2024).
Data Analysis
Data were analysed using thematic analysis and descriptive and inferential statistics for the variables of budget formulation, budget preparation, budget approval, budget execution, accounting and reporting, and external auditing. The study collected data on these variables in both qualitative and quantitative formats. Qualitative data were analysed thematically: recordings were transcribed, and key themes were identified from the transcripts. Quantitative data were analysed using the Statistical Package for the Social Sciences (SPSS), version 20, to obtain descriptive statistics (mean and standard deviation), Pearson correlations, and one-tailed significance tests. The variables measured the opinion on the frequency of the effect of PFM regulations for budget processes on service delivery in Malawian Local District Councils. Respondents were required to rate the statements in the table using a Likert scale of 1–5, where 1 is strongly disagree, 2 is disagree, 3 is neutral, 4 is agree, and 5 is strongly agree.
Reliability Test of the Study Instruments
Table 8 shows the results of the reliability test of the study instrument. Cronbach’s alpha was 0.921. This indicates high internal consistency of the instrument.
Table 8: Reliability test of the study instrument
Cronbach’s Alpha |
Cronbach’s Alpha Based on Standardised Items |
N of Items |
|---|---|---|
.921 |
.926 |
71 |
Source: Field data (2024).
Effect of PFM Regulations for Budget Processes on Service Delivery
The findings presented in Table 9 indicate that the Pearson correlation coefficient is 0.050, showing a significant underperformance score. Public Financial Management (PFM) regulations for budget processes generally have a positive effect on service delivery, though the strength and significance of the relationships vary across components. The results show that clear, well-defined budget objectives are strongly and positively correlated with service delivery (r = 0.534, p < 0.01), suggesting that when institutions set realistic, measurable budget goals, service outcomes improve significantly. Similarly, planning for programmes, activities, and projects (r = 0.318, p < 0.05), revenue management (r = 0.337, p < 0.05), proper procurement processes (r = 0.317, p < 0.05), and external auditing (r = 0.358, p < 0.05) were all moderately and significantly associated with enhanced service delivery. The data also showed moderate positive correlations between maintaining adequate and accurate transaction records (r = 0.370, p < 0.05), implementing efficient accounting and reporting processes (r = 0.394, p < 0.01), and submitting reports on time (r = 0.413, p < 0.01), highlighting the importance of accountability and transparency in budget management. In contrast, variables such as stakeholders’ participation, safeguarding of assets, and adequate human resources did not show significant correlations.
Table 9: Correlation between PFM regulations for budget processes and service delivery
|
Service Delivery |
|||
|---|---|---|---|---|
PFM Regulations for Budget Processes |
Mean |
Standard Deviation |
Pearson Correlation |
Sig. (1-tailed test) |
Budget objectives |
3.46151 |
1.02202 |
0.534** |
0.00 |
Budget formulation |
3.4615 |
1.18868 |
0.050 |
0.485 |
Budget preparation |
3.6216 |
1.16312 |
0.247 |
0.076 |
Stakeholders' participation |
3.6216 |
1.16312 |
0.247 |
0.076 |
Planning for programme/activity/project |
3.5385 |
.99594 |
0.318* |
0.028 |
Revenue management |
3.1622 |
1.36450 |
0.337* |
0.024 |
Disbursement Process against standards |
3.2105 |
1.09441 |
0.249 |
0.071 |
Budget expenditure |
2.7105 |
1.35383 |
0.042 |
0.404 |
Expense management |
3.5000 |
1.15665 |
0.039 |
0.411 |
Safeguarding assets |
3.1842 |
1.06175 |
-0.113 |
0.255 |
Adequate and accurate transaction records |
3.7838 |
1.15795 |
0.370* |
0.012 |
Accounting and reporting processes |
4.0000 |
.95618 |
0.394** |
0.009 |
Submission of reports against time framework |
3.7027 |
1.17532 |
0.413** |
0.005 |
Adequate and skilled human resources |
3.5135 |
1.12105 |
0.102 |
0.274 |
Adequate financial management, accounting and reporting system |
3.8056 |
1.00909 |
0.226 |
0.092 |
Procurement process |
3.0556 |
.92410 |
0.317* |
0.030 |
External auditors |
4.0811 |
1.03758 |
0.358* |
0.015 |
* Correlation is significant at the 0.05 level (one-tailed). ** Correlation is significant at the 0.01 level (one-tailed).
Source: Field data (2024).
Table 10: Four-year comparative analysis of audit opinions
Financial Year |
Completion Date |
Auditor’s Opinion |
||
|---|---|---|---|---|
|
|
M’mbelwa |
Nkhata Bay |
Rumphi |
2019/2020 |
30 June 2020 |
Qualified |
Qualified |
Qualified |
2020/2021 |
31 March 2021 |
Qualified |
Qualified |
Qualified |
2021/2022 |
31 March 2022 |
Qualified |
Qualified |
Unqualified |
2022/2023 |
31 March 2023 |
Qualified |
Unqualified |
Qualified |
Source: Field data (2024).
Budget Formulation on Service Delivery
The current study found that most stakeholders did not participate in budget formulation for Local District Councils for service delivery, as shown in Table 9 (mean = 3.4615, standard deviation = 1.18868, Pearson correlation = 0.050), indicating underperformance in service delivery. This contrasts with the findings of Barngetuny (2020), who found that stakeholders’ participation in budget formulation enhances service delivery in an organisation, leading to the achievement of its objectives. Barngetuny’s findings agree with those of Hussein (2019), who also confirmed that budget formulation under the decentralisation model goal enhances the local district stakeholders to participate in formulating budget for government resources for better service delivery in terms of education, health, water infrastructure building, farming and reforestation. These findings contrast with those of the present study. This was also confirmed by findings from reports and minutes of the Local District Councils of M’mbelwa, Nkhata Bay, and Rumphi for the 2024/2025 fiscal year, which reported that budget formulation at the councils was not aligned with service delivery policies to achieve the strategic service objectives. This was due to the non-participation of stakeholders in budget formulation, which led to non-compliant practices such as starting new projects before completing existing ones. These results also run contrary to Stewardship Theory, which emphasises that stakeholders should act as stewards by taking ownership of their jobs and working diligently to achieve optimal service delivery (Baporikar, 2021).
Budget Preparation on Service Delivery
Findings from the auditors’ reports (2020–2023) and the local district councils’ committee meeting minutes and reports (2023/2024) revealed that the Councils of M’mbelwa, Nkhata Bay, and Rumphi were unable to prepare their budgets in line with PFM regulations due to the non-participation of different councils’ stakeholders. This has led to unsatisfactory service delivery in different areas of the districts. These findings agree with the results in Table 9, which indicate unsatisfactory service delivery (mean = 3.6216, standard deviation = 1.16312, Pearson correlation = 0.247, one-tailed significance = 0.076). Therefore, the current findings of this study are contrary to decentralisation theory, which states that all public interest stakeholders must participate in budget preparation for government resources to enhance service delivery (Lelegwe, 2018). These findings were confirmed in an interview with an officer at the National Audit Office’s Northern Regional Office, who expressed concern about high levels of non-compliance in Local District Councils’ service delivery due to stakeholders’ non-participation in budget preparation. As a result, service delivery was characterised by abandoned projects and poor workmanship in the districts of M’mbelwa, Nkhata Bay and Rumphi. As one key informant at the National Audit Office, Northern Region, stated on 16 October 2024:
The Nkhata Bay District Council was given money to build Mzenga Secondary School Boys Hostel, and it was found that on paper shows that the Council has procured the contractor and cement for the construction of the building, but on the Ground found that the building was constructed without using cement and has shown serious defects after one year due to non-stakeholder participation in project implementation (Key informant interview, National Audit Office, Northern Region, 16/10/2024).
The above findings are contrary to the Stewardship Theory objective of enhancing service delivery by emphasising that stakeholders be stewards by taking ownership of their jobs and working diligently to achieve optimal service delivery (Baporikar, 2021).
Budget Approval on Service Delivery
The legislative body approves the budget, which is then enacted as budget legislation (Khodachek and Timoshenko, 2018). The legislative body is the representative organ of citizens in a democracy. Therefore, it is a fundamental principle under which the executive is given the authority to collect money from the public and spend it in accordance with the budget (Khodachek and Timoshenko, 2018). These observations are consistent with the present study, which found that the Council’s budgets were approved by the legislature before being utilised in service delivery, according to the 2024/2025 financial report meeting minutes of the Local District Councils. Similarly, it has also been reported in the Local District Councils Service Committee meeting reports and minutes for the year 2024 that the full Local District Council presents the budget for service delivery for the district to legislature for approval.
However, although the budgets of these local district councils were approved by the legislature, service delivery was underperforming, as shown in Table 9 (Pearson correlation for disbursement process = 0.249, revenue management=0.337*, planning for activity=0.318*, expense management = 0.039, and procurement process = 0.317*). Underperforming service delivery was also observed during field visits to development projects such as the Maganga Community Ground project in Nkhata Bay Central, the Kasongolo Bridge project in Mzimba Luwerezi, and the Chisimuka Road (District Road) in T/A Katumbi Rumphi West Constituency. These results are contrary to the second tenet of New Public Management (NPM) theory, which states that the essence of decentralising decision-making in public or private sectors is to create efficiency, flexibility, and responsiveness of public sector organisations to address the needs of their customers through increasing levels of accountability by providing services in the public sector through budget approval (Endeki and Minja, 2021). This was also confirmed by the auditor’s report for 2023:
A physical inspection of the Mzenga Secondary School Boys Hostel, constructed with Governance to Enable Service Delivery (GESD) funds and completed on November 5, 2022, revealed cracks in the floors and walls, posing a potential safety hazard. The project, contracted to Pyramid Building Contractors for a sum of K63,415,112.25, was fully paid by the time of the audit (National Audit Office report, 30 March 2023).
This indicates that the authorities approved the budget for the Mzenga Secondary School Boys Hostel, but service delivery performance was unsatisfactory due to non-compliance with PFM regulations for budget approval by local council stakeholders.
Budget Execution on Service Delivery
This study also examined how budget execution affected service delivery performance in the Malawian Local District Councils of M’mbelwa, Nkhata Bay and Rumphi. The findings show that the budget execution process for service delivery in M’mbelwa, Nkhata Bay and Rumphi districts underperformed because of non-compliance with PFM regulations for budget execution on service delivery. This is confirmed by the significance values in Table 9: disbursement process = 0.071, revenue management=0.024, planning for activity=0.028, expense management = 0.411, procurement process=0.030, and budget expenditure = 0.404. This is contrary to Financial/Fiscal Accountability Theory, which posits that political and administrative functionaries must ensure that the funds committed to a government programme should outweigh or justify the input (enormity of funds), and the action should not only be demonstrated to the public, but must be transparently proven (Orie, 2023). Similarly, this evidence is supported by the findings from Local District Councils’ Service Committee reports and minutes for Nkhata Bay, M’mbelwa and Rumphi districts, which revealed that the budget execution process on service delivery was characterised by non-compliance behaviours of poor workmanship, substandard work, deterioration of project materials, high expenditure, and limited progress on some development projects. This was contrary to the requirements of the Public Finance Management Act 2022, section 14(1)(h), which requires that all expenditure be incurred with due regard to economy, efficiency and effectiveness, to avoid waste. This was also recorded in the minutes of the Development Service Committee meeting held on 12th February 2024 at the Rumphi District Council chamber (RUDC/DEV/MIN.NO:01. 12/02/2024):
The committee expressed a keen interest in receiving an update on the progress of the construction of a theater resolution: there is minimal progress on the construction of the theater as the building has cracks, and the roof caved in. From the previous 2 meetings, the resolution was made that the contractor should not be paid until the work is complete. Unfortunately, the contractor was partially paid and then went missing; because of his absence, no progress was made. The committee members also agreed that project budgets should not be disclosed. The committee discussed and approved an increase in the project budget following evaluation, adjusting the amount to K612,000,000 (RUDC/DEV/MIN: NO:01. 12/02/2024).
This evidence is contrary to the intention of New Public Management (NPM) theory, which states that the essence of decentralising decision-making in public or private sectors is to create efficiency, flexibility, and responsiveness of public sector organisations to address the needs of their customers through increasing levels of accountability by providing services in the public sector through effective and efficient internal control (Simonet, 2018). The councils did not comply with this principle in their service delivery.
Accounting and Reporting on Service Delivery
Throughout the budget execution phase, accounting and reporting run in tandem (Weitgenant and Koester, 2025). Each spending agency is required to record its financial transactions in accordance with the government’s accounting standards. However, the results in Table 9 show that the Pearson correlations between accounting and reporting and service delivery were all below 0.5 (Adequate and accurate transaction records =0.370*, Accounting and reporting processes=0.394**, Submission of reports against time framework = 0.413**, Adequate and skilled human resources =0.102, accounting and reporting system=0.226). This suggests that accounting and reporting in the councils were underperforming.
This was also confirmed by a documentation analysis of National Auditors’ reports for the period 2020 to 2023 for the M’mbelwa, Nkhata Bay and Rumphi district councils, which revealed extensive non-compliance with International Public Sector Accounting Standards (IPSAS) in the preparation of financial statements. As a result, the councils failed to manage expenditure in accordance with the provisions of the Public Finance Management Act 2022 and other financial regulations, such as Treasury Instructions, Desk Instructions, CDF Guidelines, DDF Guidelines, and the Local Authority Accounting and Finance Management Procedures Manual, among others. The above findings also appear in Local District Council Service Committee minutes and reports for the 2024/2025 financial year, in which some service committees’ financial reports were poorly presented and did not show substantive matters that reflect the reality of events on the ground. For example, the minutes of Rumphi District Council record: “The members of the committee came to an agreement that the budgets of the projects should not be disclosed” (RUDC/DEV/MIN: NO:08. 12/02/2024). This shows that the Rumphi Council committee was not transparent and accountable in accounting for and reporting public money to the general public by denying public knowledge of the revised project budget.
External Auditing on Service Delivery
Financial and fiscal accountability theory holds that efficiency (ratio of input per output) and effectiveness (achieved output compared with declared goals and objectives) are desirable outcomes in any public sector (Orie, 2023). In this regard, the Auditor General audits local government, as provided for by the Constitution of the Republic of Malawi and the Public Audit Act of 2003 (Cap. 37:01). This supports internal checks and balances maintained by the Director of Budget. Consistent with this, the present study found that the financial and non-financial accounts of M’mbelwa, Nkhata Bay and Rumphi were audited by the National Audit Office’s Northern Region Office in accordance with the Public Audit Act 2003 (Cap. 37:01).
However, although internal and external auditors provided checks and balances, the comparative analysis of auditors’ reports for 2020 to 2023 (Table 10) shows that the M’mbelwa, Nkhata Bay and Rumphi councils mostly received qualified audit opinions. This signifies that the audit function at the councils was non-compliant with the Public Audit Act 2003 (Cap. 37:01). This was also confirmed by M’mbelwa District Council’s Finance and Audit Service Committee meeting held on 17 May 2024 at the District Council Conference Room: “...the audit queries for the 2024/2025 financial year were responded to on time. Furthermore, the Committee is pleased to report that M’mbelwa District Council attained an Unqualified/Clean Audit Opinion for the year ended 31st March 2023. This has been the first of its kind” (M’mbelwa District Council, Finance and Audit Service Committee, 17/05/2024).
These findings indicated that the Council did not comply with public finance legislation in the years before 2022/2023, as reported by the Finance and Audit Service Committee on 17 May 2024. This was contrary to Section 14(1)(d) of the Public Finance Management Act 2022, which states that the controlling officer of the public sector has a duty to maintain all accounts and records relating to the functions and operations of their institutions.
Conclusion and Policy Recommendations
The findings show that service delivery in the study councils underperformed because of non-compliance with the Public Finance Management Act 2022 in managing public funds. Therefore, the National Local Government Finance Committee should ensure that local district councils enforce the following sections of the Public Finance Management Act 2022 in order to enhance service delivery:
- Section 14 (1) (d) of the PFMA of 2022, which states that the controlling officer of the public sector has a duty to maintain all accounts and records relating to the functions and operations of their institutions.
- Section 14 (1) (h) of the PFMA of 2022, which states that the controlling officer of the public sector has a duty to ensure that expenditure is economical, efficient and effective and results in good use of public funds.
- Section 14(1)(p) of the PFMA of 2022 states that a controlling officer of the public sector has a duty to ensure that institutions have an effective internal control system that results in proper management of finances and the procurement of goods and services.
The study also found that most full council members, such as councillors and chiefs, face considerable challenges in understanding, interpreting, and presenting information. This appears to be due to their lower level of knowledge and skills compared with members of the council secretariat, which may reflect the Parliamentary and Local Government Election Act of 2023, Part III, section 21(38)(1)(c), “a person shall not be qualified to be nominated for election as a member of the National Assembly or Council unless that person: is able to speak and to read the English language well enough to take an active part in the proceedings of the National Assembly or Council.” The study therefore recommends that the qualifications for candidates seeking election as councilors be raised above basic literacy. Malawi Local Government Act 2021: Chapter 22:01; Part IX section 111 (1) states that “The Minister may by order make provision for the transfer to the employment of a successor Council of any person who is the holder of any office or employment under the Council amalgamated with another Council for the protection of the interests of such persons.” The study recommends that this section should be reviewed and amended, because it encourages non-compliant behaviour: employees found at fault in one council can simply be transferred to another. The study therefore suggests that if an employee has a fault with the council, he or she must not be transferred to another council until he or she has cleared with the council.
Due to non-compliance with PFM regulations on service delivery, the study recommends that all senior council staff be on fixed-term, performance-based contracts to enhance service delivery, and that the National Auditor also be on a performance-based contract because auditors enforce compliance in local councils. The study also observed that Council disbursements depend on the Member of Parliament writing a request to the District Commissioner to release funds for projects that have been satisfactorily appraised. This dependency has caused Constituency Development Fund (CDF) money to accumulate in the District Development Fund (DDF) account. It has also led to mismanagement of funds, resulting in prolonged delays in service delivery in various district areas. Therefore, the study has recommended that the role of MPs in managing the CDF be reviewed and amended so that MPs do not have the power to request project funds from the District Council through the District Commissioner on behalf of their constituency.
This study has contributed to public financial management by proposing the Direct Service Facility Financing (DSFF) model for fund disbursement. This model is expected to reduce the level of non-compliant behaviours among local government players by enhancing PFM regulations for better service delivery. It will shift the control of funds from Local Government Authorities (LGAs) to Primary Service Centre facilities and significantly alter the roles and relationships between these actors. The model is shown in Figure 2.
Figure 2: DSFF model for fund disbursement
DONOR PARTNERMINISTRY OF FINANCESERVICE JOINT FACILITYNATIONAL LOCAL
GOVERNMENT
FINANCE COMMITTEELOCAL DISTRICT
COUNCILDISTRICT COUNCIL DDF
ACCOUNTENHANCING COMPLIANCE AND SUPERVISIONFACILITY FINANCING ACCOUNTDONOR PARTNERMINISTRY OF FINANCESERVICE JOINT FACILITYNATIONAL LOCAL
GOVERNMENT
FINANCE COMMITTEELOCAL DISTRICT
COUNCILDISTRICT COUNCIL DDF
ACCOUNTENHANCING COMPLIANCE AND SUPERVISIONFACILITY FINANCING ACCOUNT
Source: Authors (2026).
The above figure has four options for effectively enhancing compliance and supervision of facility financing accounting in service delivery.
First Option: The long arrow to the right illustrates the first preferred option, where the treasury channels donor and Ministry of Finance funding to the facility financing account.
Second Option: The other long arrow to the left shows the second preferred option, where donors direct funding to the Facility finance account.
Third Option: The short arrow on the right shows the third preferred option, where the District Council channels funds directly into the DDF bank account.
Fourth Option: The short arrow to the left represents the role of the Local District Council and the National Local Government Finance Committee on enhancing compliance and supervision of facility financing accounting in service delivery.
Acknowledgements
We thank the Local District Councils Committees of M’mbelwa, Nkhata Bay and Rumphi districts for their support during the study by providing credible information that made this study successful. We also want to express our gratitude to the District Commissioners and their secretariat for their full support during the study.
Funding Statement
This study was funded by the Africa Centre of Excellence in Neglected and Underutilised Biodiversity, Mzuzu University, Mzuzu, Malawi.